Subject: Submission of Proposal for the Comprehensive Development of the Kumarakom Tourist Region and Kottayam District – Reg.
We respectfully submit herewith our proposal for the comprehensive development of the Kumarakom Tourist Region and Kottayam District for your kind consideration and favourable action. We sincerely hope that the proposal will receive your favourable consideration and that the initiatives and recommendations put forward therein will contribute significantly towards the sustainable development of tourism and the overall socio-economic progress of the region. We look forward to your kind consideration and support in taking forward the proposed developmental initiatives.
Thank you.
Yours faithfully,
Salim M. Das, B.Com., LL.B.
President
Chamber of Vembanad Hotels and Resorts
Kumarakom, Kottayam.
Email: salimdasilc@gmail.com
Mobile: +91 94957 35152
TOURISM-LED DEVELOPMENT STRATEGY AND PROPOSAL OF PROJECTS FOR KUMARAKOM AND KOTTAYAM DISTRICT.
How To Control Water Pollution in Vembanad Lake & In Upper Kuttanad Region, to support Agriculture, Fishermen & Promote Tourism.

a) Bring additional freshwater from the Muvattupuzha River into the waterway network connected to Ithipuzha and Kaippuzha Muttu.
b) Improve the flow of water by widening existing narrow canals and removing obstructions.
c) Improve freshwater circulation in Upper Kuttanad and Vembanad Lake, particularly during the summer months.
Dr. K. G. Padmakumar, the International Research and Training Centre for Below Sea-Level Farming (IRTCBSF), Kuttanad, and the Vembanad Lake region, have already submitted a Study Report to Kerala Government and Kerala Government had sanctioned Rs 5 crore as initial expenses for the proposed Project. The proposal as per the Study Report of Dr. K. G. Padmakumar is to open two to four shutters of Thanneermukkom Bund, throughout the years. It is a larger water-management proposal intended to bring fresh water from the Muvattupuzha River into the Ithipuzha–Kaippuzha Muttu waterway system.
Widening and Deepening of Existing Canals in the Kumarakom Tourism Region
a) Widening and deepening of the existing canals in the Kumarakom tourism region is essential to improve water circulation, strengthen flood mitigation measures, enhance inland water transport, and promote sustainable tourism.
b) Many canals in the Kumarakom region have become shallow and narrow due to the accumulation of silt (Ekkal), encroachments, and inadequate periodic maintenance. A comprehensive canal restoration programme is therefore necessary. Widening and the existing canals in Kumarakom can become an important component of the proposed Kumarakom Tourism Region Development Programme.
Upgradation of Kaippuzha Muttu Bridge, Cheepunkal Bridge and Kavanar Bridge for Promoting Canal Tourism in the Kumarakom Tourism Region.
This is an important infrastructure proposal for the integrated development of the Kumarakom Tourism Region. The three bridges can be considered as part of a larger canal tourism development strategy. Their upgradation should not be viewed merely as road infrastructure improvement, but as an opportunity to develop a connected inland water tourism network linking Kumarakom with surrounding villages and backwater destinations.
Periodic deepening of Vembanad Lake and the removal of accumulated silt (Ekkal)
a) This is essential to safeguard the lake’s ecological health, restore its natural water-holding capacity, and mitigate flooding in the surrounding regions. A comprehensive, scientifically planned and periodically implemented Vembanad Lake desilting and deepening programme should be treated as a long-term flood mitigation and lake conservation priority.
b) The objective should be not merely to remove silt, but to restore and sustain Vembanad Lake’s natural capacity to protect Kerala from Floods.
Immediate Requirement To Control, Water Hyacinth & Weeds.
a) Most practical & efficient & cost-free method to control – open Thanneermukkom Barrage, since 15th March.
Maximum closer period shall be from 15th December to 15th Marchonly.A scientific study published in 2022specifically identified more frequent opening of the Thanneermukkom Barrage to allow saline intrusion as possible approach to managing water weeds in Vembanad Lake
b) State Wetland Authority Kerala (SWAK)
A robotic aquatic weed collection pilot was about to operate in Kumarakom in September 2026. But the Proposed operation is not yet started.
c) Strict implementation of the farming calendar, Farmer progress monitoring, Early warning system, Agricultural department coordination, Bund-opening coordination, Water quality monitoring, Stakeholder coordination, can also find solution for this issue
d) Delay in Agricultural Activities and Its Impact on Vembanad Lake, Farmers are not completing their cultivation activities within the prescribed timelines specified in the farming calendar. As a result, the opening of the Thanneermukkom Bund is frequently delayed beyond the scheduled date of March 15.
c) The delayed opening of the bund disrupts the planned water-management cycle of the Vembanad Lake system. Although the bund is intended to regulate the entry of saline water into the lake, its prolonged closure affects the natural water exchange and circulation.
d) This situation can contribute to Deterioration of water quality due to reduced water circulation. Increased growth and spread of water hyacinth, Accumulation of pollutants and organic matter. Ecological imbalance in the Vembanad Lake ecosystem. Adverse impacts on Backwater Tourism, inland fishing, biodiversity and the livelihoods of local communities.
Safeguard the fragile ecosystem of Kumarakom, Upper Kuttanad, and Lower Kuttanad, urgent and coordinated eco-restoration measures must be implemented.
a) Excessive and unscientific use of chemical fertilizers and pesticides in Kuttanad paddy fields and agricultural plantations across Kottayam, Idukki and Pathanamthitta districts poses a significant threat to the water quality and ecological health of the Vembanad Lake ecosystem.
b) Agricultural runoff containing pesticide residues, excess nitrogen, phosphorus and other chemical substances enters rivers and streams during rainfall and irrigation. (Pamba River, Periyar River, Meenachil River, Manimala River, Muvattupuzha River & Achankovil River) These pollutants are transported through six major river systems that drain into the Vembanad Lake and its connected backwater network.
Protection of Soil Health, Reduction of Chemical Agricultural Inputs and Public Health Safeguards in Kuttanad
a) The growing concern over cancer cases and kidney diseases in the Kuttanad region calls for serious attention to environmental health, agricultural practices and the quality of drinking water.
b) The excessive and indiscriminate use of chemical fertilizers, pesticides, weedicides and insecticides in paddy cultivation and other agricultural activities raises concerns about potential contamination of soil, surface water and groundwater.
c) Continuous dependence on chemical agricultural inputs, without adequate attention to soil health, organic matter restoration and sustainable farming practices, may adversely affect the ecological balance of the region.
d) There is an urgent need to investigate potential environmental and occupational health risks associated with agricultural chemical exposure and to promote sustainable farming practices that protect farmers, consumers, water resources and future generations.
Development of an Integrated Digital Website Platform for Kumarakom Grama Panchayat and Other Grama Panchayats in Kerala.
a) Develop a comprehensive official website for Kumarakom Grama Panchayat that serves as a single digital platform for public information, citizen services, tourism promotion, business promotion and revenue generation.
b) The website will make all important information about the Panchayat accessible to residents, visitors, tourists, business establishments and other stakeholders.
c) Important feature will be a Tourism and Accommodation Directory, through which tourists can directly connect with hotels, resorts, homestays, houseboat operators and other accommodation providers.
d) The Panchayat can establish a structured revenue-generation mechanism by collecting approved registration, listing, renewal or advertisement charges from participating establishments, subject to applicable government rules and Panchayat approval.
Status & Alignment of Proposed Supports
a) Pedestrian Footpaths Across the Tourism Region: Partially underway. Under the Union Ministry of Tourism’s Swadesh Darshan 2.0 Scheme and the Kumarakom Iconic Tourist Site Master Plan, accessible footpaths, reconstructed pedestrian bridges, and a 400-meter boardwalk are being developed around key hubs like the Kumarakom Bird Sanctuary. Extending continuous sidewalks along the entire road network remains essential for tourist safety, as narrow stretches currently force pedestrians onto busy vehicle lanes.
b) Dedicated VIP Helipad: Under active planning. Currently, helicopter operations rely on private resort helipads at properties like Kumarakom Lake Resort and The Zuri. State officials and the District Tourism Promotion Council (DTPC) have initiated discussions to establish a dedicated, spacious VVIP and public helipad in Kumarakom to support heli-tourism and allow high-profile guests to bypass road traffic.
c) Lakeside Park (RARS or KTDC Property): Strong fit within Special Tourism Zone rules. Under Kerala Tourism’s Kumarakom Special Tourism Zone Guidelines, waterfront “No Development” zones explicitly permit public parks and pathways. Developing an open lakeside park on the vast greenery of the Regional Agricultural Research Station (RARS) or adjacent to KTDC Waterscapes would complement upcoming projects like the Malikayal Lakeside Park in Aymanam.
d) Widening of the Kottayam–Kumarakom–Cherthala Road: In progress with major upgrades, for the last so many years. Land surveying and boundary demarcation are underway for the Kottayam–Kumarakom Road Widening Project (from Illikkal Bridge to Kaippuzha Muttu) to expand the road to 13.6 meters.
Additionally, the state is pitching an elevated Kottayam–Kumarakom–Kochi Corridor connecting NH 183 and NH 66 to relieve heavy traffic without disrupting paddy fields or natural water flow. This project is to be implemented soon.
e) Dedicated Fire Station: Critical unaddressed gap. Because Kumarakom hosts high-density luxury resorts, wooden heritage structures, and hundreds of houseboats operating on fuel and cooking gas, relying on distant fire units from Kottayam or Vaikom creates dangerous response delays during peak traffic. Establishing a local Fire and Rescue Station—ideally equipped with a water-tender boat unit for backwater emergencies—is a vital safety requirement.
Development of a Public Sports Ground with a 400-Metre Running Track in Kumarakom Grama Panchayat
Develop a multipurpose public playground with a standard 400-metre running track in Kumarakom Grama Panchayat for the benefit of the general public, students, youth, sports enthusiasts and senior citizens. The project aims to create an accessible public sports and recreational facility that promotes physical fitness, healthy lifestyles, athletic development and community participation.
Establishment of Community Parks for Senior Citizens
Establish multipurpose community parks and care centres in every village/ward under the Grama Panchayat to address the recreational, social and care needs of senior citizens. A peaceful, accessible recreational space where elderly people can spend their daytime, socialise, relax, exercise and access basic refreshment and personal care facilities. This initiative will strengthen community welfare, support working families
Establishment of a 110 kV Electrical Substation at Kumarakom
a) Kumarakom is an important tourism destination and a rapidly developing residential and commercial area in Kottayam district. The increasing demand for electricity from households, hotels, resorts, homestays, houseboats, commercial establishments, agricultural activities and tourism-related infrastructure requires a reliable and adequate power supply.
b) The growing electricity demand, particularly during peak tourist seasons, can place additional pressure on the existing distribution network.
Public Awareness and Strict Enforcement for the Protection of Public Water Bodies.
a) Public water bodies such as rivers, canals, ponds, streams, lakes and other freshwater resources are essential for drinking water, agriculture, fishing, tourism and maintaining ecological balance.
However, indiscriminate dumping of waste, discharge of sewage, release of untreated wastewater, disposal of plastics and other pollutants, and encroachment on public water bodies threaten these valuable natural resources. b) Protect all public water bodies from pollution and encroachment. Create awareness among residents, tourists and business establishments. c) Prevent dumping of plastic, solid waste and other pollutants. d) Stop the discharge of untreated sewage and wastewater. e) Protect drinking water sources. f) Encourage community participation in water conservation. g) Establish effective complaint and monitoring mechanisms. h) Ensure strict enforcement of applicable environmental laws.
ABOUT PROJECTS DECLARED BY GOVERNMENT
BUT IT HAVE NEVER GONE AHEAD.
1)Kottayam – Kumarakom Eco-City Project Launched
January 29, 2002
The Environment and Forests Minister, Shri T.R. Baalu launched the Kottayam Kumarakom Eco-City project at a function in Kottayam, Kerala. Shri Baalu stated that the Kottayam-Kumarakom region was chosen for the first Eco-city project in the country for three reasons. First, it is the fulfilment of the promise made by the Prime Minister, Shri Atal Bihari Vajpayee to the people of Kerala. Second, the rapid growth of backwater tourism warrants urgent measures to ensure its sustainability. The Third and foremost reason, however, is the positive response and enthusiasm of the enlightened people of Kerala and their representatives who have set aside political differences in endorsing the concept. The Kottayam–Kumarakom Eco-City Project, proposed jointly by the Kottayam Municipality, eight surrounding Grama Panchayats, the Kerala Government and the Central Government, had an estimated proposed project cost of ₹500 crore. The announcement was reported by PTI in The Times of India on 23 January 2002. The proposed project covered an approximately 50-km radius around Kumarakom and included:
a) Upgrading the Kottayam–Kumarakom road to six lanes.
b) Construction of bypass roads.
c) Improvement of drinking water and air quality.
d) Establishment of a botanical garden.
e) Modernisation of waste disposal facilities.
f) Modernisation of local markets.
2) Kumarakom, one of the 17 sites identified by the Ministry of Tourism, GOI, to be developed as an Iconic Tourist Site.
Kumarakom – Iconic Tourist Destination Project Ministry of Tourism, Government of India | Project details, estimated cost and funding status. Kumarakom was officially identified by the Government of India in 2018 as one of the country’s proposed Iconic Tourist Sites. Subsequently, the Ministry of Tourism prepared a draft master plan for its integrated tourism development. An important finding from the official records is that Kumarakom’s Iconic Tourist Destination project had an estimated development cost of approximately ₹283 crore, but this amount was not sanctioned as Central Government funding under the original Iconic Tourist Destinations Scheme. 2018-Union Tourism Minister Shri Alphonse Kannanthanam, had convened a meeting at the conference hall of Backwater Ripples for the development of Kumarakom Tourism Zone. (200 Crore Project)
3) Swadesh Darshan 2.0 – Kumarakom Bird Sanctuary Experience Project, Not Completed Within The Scheduled Time.
The objective is to improve Kumarakom Bird Sanctuary as an internationally attractive eco-tourism and bird-watching destination while improving visitor facilities, interpretation, accessibility and the overall visitor experience. Kiosks, Canal revitalization, Landscaping, Footpaths, Pedestrian bridges, Boat jetty-deck, Boardwalk, Watchtower, Interactive zone, and Digital terminal deck. This Project Was sanctioned in 2023—24 The Kumarakom Bird Sanctuary Experience Project is a Central Government-funded tourism infrastructure development project sanctioned under the Ministry of Tourism’s Swadesh Darshan 2.0 Scheme. Expected Project Cost 13.53 Core. (This is a separate project from the earlier ₹283 crore Kumarakom Iconic Tourist Destination master plan.) This Project was started 18 Months back by closing down the Kumarakom Birds Sanctuary. Even today neither the work is completed nor the Kumarakom Birds Sanctuary is opened
PROPOSAL FOR RESTRUCTURING THE KUTTANAD RICE CULTIVATION SYSTEM AS THE PRIMARY OPTION FOR PROTECTING VEMBANAD LAKE.
The concerns raised about the traditional dewatering system in Kuttanad deserve serious attention. There is a need to modernise the system of paddy cultivation below sea level while protecting the ecological health of Vembanad Lake and the livelihoods of local communities. Kuttanad is an ecologically sensitive agricultural region where farming, fisheries, inland waterways and human settlements are closely interconnected.
The problem with the existing dewatering system
Kuttanad rice cultivation involves pumping water out of low-lying paddy fields enclosed by bunds (polders). During the three-to-four-month cultivation period:
a) Water is periodically drained and replenished.
b) Agricultural fertilisers and pesticides enter into the public waterbodies, used by the general public.
c) Drainage channels carry this water into canals, rivers and connected parts of Vembanad Lake.
d) Repeated discharge can contribute to nutrient loading, chemical contamination and ecological stress.
e) The cumulative impact deserves investigation, particularly because the lake supports fisheries, drinking-water resources, agriculture and the livelihoods of a large population.
Importantly, There Is Scientific Evidence Supporting These Concerns
a) A 2024 research paper published in Environmental Monitoring and Assessment investigated pesticide residues in fish from the Kuttanad wetland and assessed potential human health risks.
b) Indian Council of Agricultural Research, has acknowledged environmental stress associated with indiscriminate use of chemical fertilisers and plant-protection chemicals in Kuttanad.
c) A study of Vembanad water quality identified agricultural waste, industrial waste, household sewage, and other sources as contributors to water-quality deterioration.
Origin Of Dewatering System In Kuttanad Farming
More than 200 years ago, farmers in Kuttanad initiated below-sea- level rice cultivation utilizing a dewatering system, a practice maintained over the years. Then, the dewatering method of rice farming did not pollute public water bodies. Reasons Are the Following:
a) Farmers did not use any pesticides during that period. Rice farmers in Kerala and other parts of India used Kummayam in traditional paddy cultivation.
b) The use of organic manures, such as cow dung and ashes, were
their primary approach to fertilization.
c) Furthermore, they did not utilize any chemical fertilizers.
Other Factors Contributing To The Water Pollution.
a) Water scarcity, even during the rainy season, affects river water
flow. Historically, there has been a consistent water flow from the rivers and canals into Vembanad Lake from April and May until December.
b) The four primary rivers—Pampa, Manimala, Achankovil, and
Meenachil—converge into the Arabian Sea at Thottappally and Thanneermukkom. Additionally, the Muvattupuzha River discharges into Vaikom and the Cochin backwaters, located north of the Thanneermukkom bund. However, the construction of many Check Dams and Irrigation Canals has redirected river water for agricultural and other uses. Consequently, water flow in the rivers now primarily occurs during heavy rainfall.
c) Unscientific Closure of Thanneermukkom Barrage, which is
operational since 1976 The Thanneermukkom Barrage is typically closed from December 15 to until April, till the rice cultivation is over, which prevent saline water from entering the Kuttanad region. During the monsoon season, the barrage shutters are opened to allow floodwaters to pass through. In practice, however, the closure may extend from December 15 until April or May.
d) Consequently, the southern side of the Thanneermukkom Barrage is prevented from saltwater intrusion, and there are no high or low
tides during this period. This closure leads to water stagnation within the Kuttanad region for approximately four to five months because of the absence of water flow. This water stagnation also occurs during the summer months, attributed to the unscientific closure of the Thanneermukkom Barrage. This life for the local people in Kuttanad becomes quite miserable.
e) Farmers spray around 500 tonnes of pesticides uncontrollably in
55,000 Hectares of paddy fields in Kuttanad. Around 500 tonnes of pesticides are sprayed in Kuttanad Paddy fields during each farming season every year. Thus, the polluted water in the paddy fields is dewatered into the public Water Bodies of Kuttanad Rivers, canals, and Vembanad Lake. Farmers can use chemical fertilizers without any imposed restrictions. These chemicals and fertilizers dissolve in the water and contaminate public water bodies.
f) Farmers use substantial dosages of Chemical Manures 15,000 TO 20,000 tonnes, for 55,000 Hectares of farming in Kuttanad.
Over four months, this polluted water will be continuously discharged into public water bodies for at least 36 days (864 Hours) in a farming season of four months. It happens before starting the farming, after spraying pesticides around four to five times, after discharging chemical fertilizers in the paddy field around four to five times, and it will continue until harvesting.
g) During a farming season, around 15,000 Cubic Meters of Polluted
water per Hectare will be pumped into public water bodies. Therefore, from 55,000 Hectares of paddy fields in Kuttanad , 83 to 90 crores of dangerously polluted water is dewatered to the Public Water Bodies of Kuttanad Rivers, canals, and Vembanad Lake.
h) Construction of numerous bridges across the canals and rivers in
Kuttanad has narrowed the width of the rivers and canals. This change has adversely affected water flow and significantly increased pollution levels in the canals, rivers, and Vembanad Lake. Consequently, the water in these areas has become increasingly polluted.
PROPOSED MEASURES FOR THE LONG-TERM CONTROL OF WATER POLLUTION IN THE KUMARAKOM BACKWATER TOURISM DESTINATION
**
a) The Thanneermukom Bund should remain open throughout the
year to ensure a consistent water flow. Maintaining the shutters in an open position year-round will facilitate saltwater intrusion on the southern side of the Bund, effectively mitigating the challenge posed by water weeds. Consequently, this strategy will enhance the management of water weeds and pollution in Vembanad Lake, leading to significant cost savings associated with water weed control efforts.
b) The existing dewatering practices followed in Kuttanad Rice Cultivation should be reviewed and modified, as they are a major contributing factor to the pollution of public water bodies.
c) Farmers must strictly adhere to the established agricultural calendar, ensuring that the Thanneermukom Bund remains closed for a period not exceeding 90 days, specifically from December 15 to March 15.
d) If the outer bund of all paddy fields in Kuttanad are strengthened, widened and raised, farmers will be able to cultivate rice even during the monsoon season. This will help reduce the use of chemical fertilisers and pesticides while improving crop yields. Consequently, the Thanneermukkom Bund could remain open throughout the year.
e) Proposal For The Conversion Of Paddy Lands In Kuttanad For Alternative Agricultural And Tourism-Related Activities.
The Government should consider permitting the conversion of paddy lands in Kuttanad for alternative agricultural purposes and tourism-related activities, subject to appropriate environmental safeguards. This would help reduce the area under conventional paddy cultivation, particularly because the existing dewatering practices associated with rice cultivation may pose serious risks to human health and the environment in Kuttanad. Since 1900, following a shortage of rice, the Government encouraged farmers to cultivate paddy in Kuttanad by adopting dewatering methods. As a result, several areas that were originally part of Vembanad Lake were reclaimed and converted into paddy fields. However, considering the present serious environmental and public health concerns associated with the existing cultivation practices, the Government should sympathetically consider the requests of farmers who wish to convert their paddy lands for alternative agricultural activities and tourism-related purposes, subject to suitable legal provisions and environmental considerations.
f) Kerala’s total consumption of Rice is 42 lakh tonnes, Rice produced in Kerala,including Kuttanad, is 5.5 lakh tonne, and Rice produced in Kuttanad is only 3 Lakh tonne. Therefore the Rice produced in Kuttanad is only 7% of Kerala’s required consumption. Therefore, continuing with this dangerous farming method of dewatering in Kuttanad is not essential.
Increasing Reports of Serious Health Problems Among the People of Kuttanad
a) It is a well-known concern that water pollution in Kuttanad poses a serious potential threat to public health and the environment. The deteriorating quality of water has raised concerns about its possible impact on the health of local residents. There are growing concerns about various health problems, including cancer and kidney-related diseases. The possible links between these health conditions and water pollution need to be investigated through comprehensive scientific studies.
b) Another recurring concern in Kuttanad is the frequent outbreak of bird flu (avian influenza), which has been reported on several occasions. Whenever an outbreak occurs, the authorities impose restrictions and order the mass culling of affected or potentially exposed birds, including ducks and chickens, to prevent the further spread of the disease.
c) While such emergency measures may be necessary to control an outbreak and protect public health, greater attention should also be given to identifying and addressing the underlying environmental factors that may contribute to disease outbreaks.
d) Instead of focusing exclusively on controlling the immediate symptoms of such outbreaks, the authorities should undertake comprehensive investigations into the environmental conditions prevailing in Kuttanad, including water quality, sanitation, poultry-rearing practices and other possible risk factors.
e) It is important to understand that the outbreak and spread of infectious diseases depend not only on the presence of disease-causing pathogens but also on environmental conditions and the susceptibility of the host. Therefore, maintaining a healthy environment and protecting the quality of water are essential for safeguarding all forms of life, including human beings, animals and birds.
f) Accordingly, the Government should give urgent priority to improving the water quality of Kuttanad, investigating the possible environmental factors contributing to public health problems and preventing recurring disease outbreaks. Protecting the ecosystem is essential for ensuring the long-term health and well-being of the people, animals and birds of Kuttanad.
Other Serious Concern
a) E-waste, LED bulbs, Plastics and other materials inevitably pollute the mud at the bottom, due to the high acidity in the water and the accumulation of silt and sediments in the Kuttanad Paddy Fields, Canals, and Lake Vembanad. This pollution undoubtedly infiltrates
the food chain, as fish and shellfish (kakka) directly consume contaminated organisms from the mud. This, in turn, introduces heavy metals into the human food chain.
b) The Government is providing lime to correct the PH conditions for
Rice farmers. The fish in our lake are growing in the water, contaminated with acid.

Impact of Acidic Water and Agricultural Chemicals on the Kuttanad Ecosystem and Public Health.
a) Several studies have suggested that acidic water can have detrimental effects on clam beds and other aquatic ecosystems. Professor Dr. Padmakumar has stated that, every year, following the first monsoon rains, acidic water leaches out of the soils of paddy fields (Padasekharams) in Kumarakom, Vechoor, Aymanam and Kallara and flows into Vembanad Lake. This phenomenon is reportedly associated with the mass mortality of clams and fish. Karimeen (Pearl Spot), which breeds in the lake’s bottom habitats, is particularly vulnerable to adverse changes in water quality. According to Professor Padmakumar, certain areas of the lake near Kumarakom have become increasingly unsuitable habitats for several
aquatic species.
b) The increasing incidence of cancer and kidney-related diseases in Kuttanad has also raised serious concerns about the possible health impacts of excessive and indiscriminate use of weedicides, insecticides and other agricultural chemicals, particularly when adequate attention is not given to soil health and environmental protection. The possible links between these health conditions and exposure to agricultural chemicals require comprehensive scientific investigation.
c) We must proactively establish effective mechanisms to prevent hazardous substances from entering the food chain. Rather than responding with panic, our priority should be to substantially reduce the leaching, accumulation and uptake of hazardous substances, including heavy metals, by rice crops and other aquatic food sources.
It is imperative to restore and maintain healthy soil and water conditions, prevent the contamination of agricultural produce and aquatic food resources, and minimise human exposure to hazardous substances. Such Measures Are Essential To Protect Public Health, Preserve Biodiversity And Safeguard The Long-Term Ecological Balance Of The Kuttanad Region, Which Includes 3 Districts of Kerala.